Exhibition of Studio Projects
Craft and waste
Annotation
The study deals with the design of the waste collection site in Hořín near Mělník. The existing areal does not use the full potential of the site and is operationally dysfunctional. Only a part of it is used for the operation of the collection plant, and the rest of the buildings thus lie idle.
With the proposal, I respond to the current situation by maintaining two halls, to which 3 new halls and an administrative building with facilities for employees are being added.