The unstable area has been observed since 2002 with use of coupled geotechnical and geodetic monitoring. A long anchored pile wall built in 2007 stabilises upper part of the slide and the lower one is stabilised by a huge embankment under construction, now. Monitored data are applied in assessment of stability development.