Following the completion of large repairs of Charles Bridge, a number of faults appeared in the bridge structures. The dug holes made right after the completion of the repairs in arches III, IV, IX and XIII in 1983 proved continued leakage of rain water into the body of the bridge and high moisture content of fillers.
Publikace